295-SE-ERS
Return to Stationary Electric LoadersThe Barko 295-SE-ERS stationary electric loader is powered by an electric remote station. Featuring all-welded boom construction, the unit offers a max lift capacity of 22,820 pounds.
Power Sources
The 295-SE-ERS is available with a 100-HP (75 kW) open drip proof encapsulated electric motor, electrical enclosure with motor start circuit, and start/stop switches supplied for the control console.
Pedestal
Loader is mounted a standard 33-inch-tall (838 mm) pedestal with 39-inch (991 mm) diameter bottom plate.
Load Sensing Hydraulics
Load sensing valves and pump deliver excellent metering by matching pressure and flow. Efficient and precise grapple functions reduce operator fatigue.
Joystick Controls
Ergonomically designed, multi-functional, dual electric-controlled joysticks are supplied for mounting into the operator station.
Boom Construction
Wider, all-welded boom construction with fabricated box type design includes engineered sweeping curves for added strength and increased fatigue resistance.
Swing Torque
Dual motors and planetary gearboxes produce 30,000 foot-pounds (40,674 Nm) of swing torque.
Zinc Plated Pins
Extra large zinc plated pins and bolts provide added durability in high-stress areas.
Centralized Valves
Centralized hydraulic control valves are easily accessible.
Bolt-On Cylinder Glands
Bolt-on cylinder glands make on-site service easy, while piston rings extend product life. Cylinders are made of heavy-duty steel tubing, and heavy chrome cylinder rods are heat-treated for added strength.
Service
Removable service panels simplify maintenance tasks.
Counterweight
Optional 1,300- or 3,000-pound (590 or 1,360 kg) cast steel counterweights for larger loads.
Attachments
Log & pulp grapples
Grapple saw
Boom
30-foot (914 cm) live heel boom
360-Degree Rotation
Optional hydraulic rotary manifold allows for 360-degree continuous boom rotation.
Accessories
380 or 575-volt electric system
Hydraulic reservoir heater (3 kW)
Automatic grease system
Boom lights (12V DC)
Detachable heel bar (standard/offset, single/double vee)
Magnet rectifier package (10 or 15 kW)
Rotation stops (310-degree maximum)